EV charging / Project guide

EV charging feasibility assessment

Define an assessment of shared-property charging before choosing equipment or an installation scope. Bring the parking arrangements, current requests and available electrical records into one brief for the project provider.

The decision this helps you make

What to aim for.

A documented set of feasible approaches, assessment limits and decisions needed before design or installation.

Start with the information below, then choose your property type for the access, operating and decision-making details that shape the project.

Define the scope.

  • Identify the parking areas and the users the initial charging project should serve.
  • Describe the desired first phase and how participation might grow over time.
  • Ask the provider to assess the electrical, ownership and operating questions relevant to the site.

Put these records together.

  • Collect parking plans, stall allocation information and the current list of charging requests.
  • Provide available electrical drawings, equipment records and earlier charging or capacity assessments.
  • Identify the property decision-maker and any agreements affecting the parking or shared infrastructure.

Choose your property type.

Ask for a comparable proposal.

  • Define the assessment deliverables and distinguish preliminary options from an installation design.
  • Ask how equipment ownership, billing and ongoing support will be considered in each option.
  • Separate site investigation, utility coordination and further design from the initial assessment fee.

Understand what affects the cost.

Ask providers to price the same scope and explain the assumptions behind these items.

  • The number and distribution of parking spaces included in the assessment.
  • The quality of existing electrical records and the investigation needed to confirm site conditions.
  • The range of ownership, operating and expansion options the decision-makers want evaluated.

Working checklist

Build your project brief.

Use this page as a working checklist. Print the completed view for your records. These entries are separate from the introduction request.

Project: EV charging feasibility assessment

Agree on the handover.

  • Keep the assessment with its assumptions, options and identified information gaps.
  • Record the decisions needed about funding, participation, ownership and ongoing operations.
  • Obtain a clear brief for the next design or quotation stage.

Questions before you begin.

Should we select chargers before commissioning the assessment?

Describe the intended users and operating needs first. Ask the provider to explain equipment choices against the site assessment, desired expansion and ownership model so the selection follows the project requirements.

What information helps plan for future charging demand?

Provide current requests, parking allocation and a realistic description of future participation. Ask the assessment to explain expansion assumptions and the decisions that would change the proposed approach.

Continue planning.

About this guide.

Prepared by Booked Intros. These project checklists help owners, boards and managers organize a scope and compare proposals. Your provider confirms the technical approach, local requirements and site-specific conditions.

Content updated: . How our guides are prepared.

Move the project forward

Bring us the property and the scope.

Share your address, project and timing. We will review the request and confirm whether a suitable provider is available for the work.

Request an introduction