EV charging / Project guide

Shared EV charger installation

Prepare an installation request after the property has a defined charging approach. Tie the equipment and parking scope to the electrical assessment, user access and the responsibilities for operating the completed system.

The decision this helps you make

What to aim for.

An installation proposal with clear equipment, infrastructure, commissioning and operating responsibilities.

Start with the information below, then choose your property type for the access, operating and decision-making details that shape the project.

Define the scope.

  • Identify the parking spaces and charging equipment included in the first installation.
  • Define the agreed operating model, user access and responsibility for shared infrastructure.
  • Ask the provider to confirm the design and site information needed before installation begins.

Put these records together.

  • Share the approved assessment, available design documents and the parking allocation plan.
  • Identify equipment preferences, ownership agreements and the contact coordinating the property decision.
  • Provide access restrictions, operating hours and arrangements for work around parked vehicles.

Choose your property type.

Ask for a comparable proposal.

  • Separate shared electrical infrastructure, individual charging equipment and installation work.
  • Ask for commissioning, software setup, user onboarding and ongoing support to be itemized.
  • Clarify permits, utility coordination and inspection responsibilities with the proposed project team.

Understand what affects the cost.

Ask providers to price the same scope and explain the assumptions behind these items.

  • The distances between electrical equipment and parking locations and the routes available.
  • The infrastructure work identified in the design and the selected operating model.
  • Parking disruption, installation phases and coordination with other work at the property.

Working checklist

Build your project brief.

Use this page as a working checklist. Print the completed view for your records. These entries are separate from the introduction request.

Project: Shared EV charger installation

Agree on the handover.

  • Collect installed equipment records, completed drawings and commissioning or verification documents.
  • Confirm administrator access, ownership of accounts and the contact for service problems.
  • Keep instructions for users, maintenance responsibilities and the process for adding future participants.

Questions before you begin.

What recurring charges belong in the comparison?

Ask each provider to explain software, payment processing, connectivity, maintenance and support charges where applicable. Identify who pays each item and how changes or additional users affect the arrangement.

Can providers quote from a parking plan alone?

A parking plan helps establish locations. Ask the provider to identify the electrical assessment, design and site investigation needed before the proposed installation scope and price can be confirmed.

Continue planning.

About this guide.

Prepared by Booked Intros. These project checklists help owners, boards and managers organize a scope and compare proposals. Your provider confirms the technical approach, local requirements and site-specific conditions.

Content updated: . How our guides are prepared.

Move the project forward

Bring us the property and the scope.

Share your address, project and timing. We will review the request and confirm whether a suitable provider is available for the work.

Request an introduction