Office buildings: Project Planning

An office project works best when the brief distinguishes the shared building systems from the spaces operated by individual tenants.

The operating context.

An office project works best when the brief distinguishes the shared building systems from the spaces operated by individual tenants. Identify the asset, floor or suite involved and provide the existing drawings and service history that help define the starting point. The owner or asset manager may approve the investment while a property manager coordinates delivery and tenant contacts explain their operating needs. Record those roles before requesting comparable proposals. Occupancy patterns, meetings and business-critical activities can influence when investigation or disruptive work is practical.

Discuss access through reception, loading areas and secure suites, including who can escort visiting contractors. If a project touches both shared and tenant-controlled assets, flag that boundary for review instead of allowing each bidder to assume a different scope. Ask how the contractor will communicate proposed interruptions, new findings and changes requiring approval. At handover, collect asset records, updated information and the remaining action list. The goal is a project record that the facilities team can use while tenants receive a clear account of the work affecting their space.

Bring the right people into the decision.

  • Owner or asset manager approving investment and project scope
  • Property or facilities manager coordinating shared building systems
  • Tenant representatives confirming suite access and business operating needs

Gather the property records.

  • Available building-system drawings and prior service or investigation reports
  • Tenant scope boundaries identified for review with the property team
  • Occupancy schedules and known business-critical events during the project

Plan access before the visit.

  • Reception sign-in, secure suite access and contractor escort arrangements
  • Loading dock bookings, freight elevator use and material storage
  • Work windows coordinated with affected tenant representatives

Project collection

Roofing

Office roofing work can interact with rooftop plant and tenants working beneath the project area. Share the roof access arrangements and coordinate with the facilities team before asking for a detailed sequence.

Project collection

Plumbing

Office plumbing requests can involve shared washrooms, tenant kitchens and services crossing multiple suites. Define the affected locations and clarify who coordinates tenant access so the plumber can plan an efficient assessment.

Project collection

Fire safety

Office fire safety projects may cross landlord systems and separately controlled tenant spaces. Bring inspection findings, corrective work or upgrade proposals together with responsibility records, tenant contacts and the building’s operating schedule.

Project collection

EV charging

Office charging proposals need a clear picture of employee, visitor and tenant parking use. Explain the intended users and operating arrangements so an installer can assess the project with the property and facilities teams.

Project collection

Commercial electrical

Office electrical work needs coordination with tenant equipment and business activity in the affected spaces. Start with the reported issue or planned fit-out and identify the facilities contact responsible for the shared building system.

Project collection

Heating, cooling and ventilation

Office HVAC concerns often depend on room use, occupancy and the timing of complaints. Provide those observations along with existing service records so the provider can discuss the affected zones and investigation scope.

Project collection

Building envelope

Office envelope work may affect exterior access and business activity inside perimeter suites. Bring together the exterior observations and tenant reports so the provider can assess their locations and propose a coordinated investigation.

Project collection

Grounds and landscape care

Office grounds work needs to fit around commuting, visitor arrival and deliveries. Define the maintained areas and expected presentation, then explain how the property team coordinates outdoor work with tenant-facing building operations.

Keep useful records after completion.

  • Asset-level service records and updated project drawings
  • Tenant-specific completion notes where work enters leased space
  • Operating guidance and open items assigned to a named contact

About this guide.

Prepared by Booked Intros. These project checklists help owners, boards and managers organize a scope and compare proposals. Your provider confirms the technical approach, local requirements and site-specific conditions.

Content updated: . How our guides are prepared.

Move the project forward

Bring us the property and the scope.

Share your address, project and timing. We will review the request and confirm whether a suitable provider is available for the work.

Request an introduction